We have put together some useful information to make the installation of your converter and downstream equipment a little easier:

  • Harmonics are one of those things that its best to plan prior to installation than trying to sort out after, this two page publication from Schneider electric highlights some important points to consider in the planning process:

Harmonic Management

  • Lightning and surge protection , if you are in a area that is prone to this use this guide, its based on I.E.C standards that A.S standards have followed:

               Surge protection for rural installations

  • What to know what your three phase load will draw from 240 or 480 volt single phase ? , here is the guide:

               Current converter

  • Phase converter/generator “short circuit” protection explained:

              Trip curve